The Port of Bremerton has formally reissued its solicitation for the multi-million dollar Port Orchard Marina Breakwater Replacement Project, advancing a critical infrastructure overhaul to safeguard public moorage and maritime transit in Sinclair Inlet.
Rothlin emphasized that losing the breakwater would force an immediate shutdown of the marina, jeopardizing an economic engine that generates roughly $16 million in annual commercial activity for the surrounding community through retail spending, maritime service employment, and marine tourism.
Port commissioners plan to review the submitted bids in December to award the general contract ahead of anticipated in-water work windows established by state and federal wildlife agencies.
Demolition, Pontoon Engineering, and Environmental Restoration Comprehensive engineering details published on the Port of Bremerton project portal detail a complex phased construction sequence designed to maintain marina access throughout the replacement process.
Upgraded fire protection capabilities represent one of the most substantial public safety enhancements included in the engineering design.
The Port of Bremerton has reissued competitive contractor bids for its $25 million Port Orchard Marina Breakwater Replacement Project, replacing a 50-year-old wave barrier to protect 441 slips, passenger foot ferries, and maritime commerce across Sinclair Inlet.